PENENTUAN DISPATCHING RULES PADA PENJADWALAN DUA MESIN CNC YANG DISUSUN SECARA SERIES
Abstract
PT. KOP is a company engaged in oil and gas drilling. This company has 4 products, where the company uses 2 machines arranged in parallel. The product is finished on 2 machines with two setups. PT. KOP often experiences delivery delays due to inaccurate production scheduling. This study applies the scheduling of proposals using the SPT (Shortest Processing Time), LPT (Longest Processing Time), and Jhonson methods. The results of this study indicate that the Johnson method is a better method than the SPT (Shortest Processing Time) and LPT (Longest Processing Time). Johnson's method has the minimum delay time. In the first week, the delay was 1 hour, 16 hours in the second week, 48 hours in the third week, and 86 hours in the fourth week. From the results of the flow time data using the Johnson method, namely 1 hour in the first week, 16 hours in the second week, 48 hours in the third week, and 86 hours in the fourth week. There is a savings in tooling usage of 50%. Series machines only require 4 tooling, while parallel machines require 8 tooling.References
Arifin, Z., 2021. PENJADWALAN PRODUKSI SPEAKER DENGAN PENDEKATAN HEURISTIC DISPATCHING RULE DI STATION DOUBLE RE UNTUK MENGOPTIMALKAN WAKTU ALIR RATA-RATA di PT. ABC.
Jurnal. Staff Pengajar Program Studi Teknik Industri Universitas Riau Kepulauan Batam.
Ariyanti, S., A. & Miharja, R., 2018. USULAN PENJADWALAN PRODUKSI BENANG MENGGUNAKAN METODE NEH DAN METODE ALGORITMA JOHNSON UNTUK MEMINIMASI WAKTU PRODUKSI DI PT. LAKSANA KURNIA MANDIRI SEJATI. Jurnal. Ilmiah Teknik Industri.
Irwan, H., 2021. Metode Minimasi Makespan dengan Menghilangkan Waktu Tunggu pada Penjadwalan Job Shop. Jurnal. Prodi Teknik Industri, Universitas Riau Kepulauan.
Irwan, H., 2020. Optimasi Penjadwalan Job Shop dengan Metode Algoritma Greedy. Jurnal. Prodi Teknik Industri, Universitas Riau Kepulauan.
Muharni, Y., M, A. I. S. & Rubyanti, T. E., 2019. PENJADWALAN FLOW SHOP MESIN PARALEL MENGGUNAKAN METODE LONGEST PROCESSING TIME DAN CROSS ENTROPY- GENETIC ALGORITHM PADA PEMBUATAN PRODUK STEEL BRIDGE B-60. Jurnal. Ilmiah
Copyright (c) 2023 PROFISIENSI: Jurnal Program Studi Teknik Industri

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
PROFISIENSI uses an exclusive license agreement. The authors will retain copyright along with the rights for academic use, while Universitas Riau Kepulauan will be granted publishing and distribution rights.
Open-access authors retain the copyright of their papers, and all open-access articles are distributed under the terms of the Creative Commons Attribution License (CC-BY), allowing others to distribute and copy the articles as long as the original work is properly cited.
Users cannot represent authors as support for the adaptation of their articles and do not change articles in such a way as to damage the honor or reputation of the author.
