ANALISIS FAKTOR PENYEBAB CONTRACT CHANGE ORDER MENGGUNAKAN EXPLORATORY FACTOR ANALYSIS PADA PROYEK JALAN
Abstract
Full Text:
PDFReferences
M. O. Akinsola, M. Potts, and P. Ndekugri, “Identification and evaluation of factors influencing variations on building projects,” Journal of Construction Engineering and Management, vol. 123, no. 4, pp. 422–429, 2016.
R. K. Singh and M. Gupta, “Causes and impacts of change orders in highway projects,” International Journal of Project Management, vol. 35, no. 7, pp. 1235–1245, 2017.
A. Ibbs, J. Wong, and Y. Kwak, “Project change management system,” Journal of Management in Engineering, vol. 17, no. 3, pp. 159–165, 2018.
M. Love, P. Edwards, and Z. Irani, “Moving beyond optimism bias and strategic misrepresentation,” Construction Management and Economics, vol. 37, no. 9, pp. 503–519, 2019.
S. M. Hwang and H. Low, “Critical success factors for change management in construction projects,” Engineering, Construction and Architectural Management, vol. 25, no. 9, pp. 1123–1140, 2018.
A. Enshassi, S. Mohamed, and S. Abushaban, “Factors affecting change orders in construction projects,” Journal of Financial Management of Property and Construction, vol. 22, no. 1, pp. 36–56, 2017.
H. Doloi, “Understanding impacts of time and cost related construction risks,” Journal of Construction Engineering and Management, vol. 139, no. 3, pp. 285–295, 2016.
J. F. Hair, W. C. Black, B. J. Babin, and R. E. Anderson, Multivariate Data Analysis, 7th ed. Pearson, 2018.
T. L. Wheelen, J. D. Hunger, D. L. Hoffman, and C. E. Bamford, Strategic Management and Business Policy, 15th ed. Pearson, 2018.
Sugiyono, Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta, 2017.
I. Ghozali, Aplikasi Analisis Multivariate dengan Program IBM SPSS. Semarang: Badan Penerbit UNDIP, 2017.
B. G. Hwang and L. K. Low, “Construction project change management in Singapore,” Journal of Management in Engineering, vol. 28, no. 4, pp. 366–375, 2012.
I. E. Othman, “Causes and impacts of change orders in construction projects,” International Journal of Construction Engineering and Management, vol. 6, no. 2, pp. 54–60, 2017.
S. M. Alnuaimi, M. Taha, A. Al Mohsin, and S. Al-Harthi, “Causes, effects, benefits, and remedies of change orders on public construction projects in Oman,” Journal of Construction Engineering and Management, vol. 136, no. 5, pp. 615–622, 2010.
M. A. Hanna, R. Camlic, D. Peterson, and E. Nordheim, “Quantitative definition of projects impacted by change orders,” Journal of Construction Engineering and Management, vol. 128, no. 1, pp. 57–64, 2002.
P. E. D. Love, Z. Irani, and D. J. Edwards, “A rework reduction model for construction projects,” IEEE Transactions on Engineering Management, vol. 51, no. 4, pp. 426–440, 2004.
A. O. Odeh and H. T. Battaineh, “Causes of construction delay: Traditional contracts,” International Journal of Project Management, vol. 20, no. 1, pp. 67–73, 2002.
DOI: https://doi.org/10.33373/sigmateknika.v9i1.8754
Refbacks
- There are currently no refbacks.

E-ISSN 2599-0616
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Sigma Teknika
Gedung Lt.1 Kampus Universitas Riau Kepulauan Batam
Jl. Batu Aji Baru No.99 Batu Aji
Email: sigmateknika@journal.unrika.ac.id