PENGARUH KOMUNIKASI MANAJER PROYEK TERHADAP KUALITAS KONSTRUKSI PABRIK DI PT X BATAM
Abstract
Keywords
Full Text:
PDFReferences
Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 7th ed. Newtown Square, PA, USA: PMI, 2021.
H. Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 13th ed. Hoboken, NJ, USA: John Wiley & Sons, 2022.
D. A. Aga, N. Noorderhaven, and B. Vallejo, “Transformational leadership and project success in construction: The mediating role of team-building and communication,” International Journal of Project Management, vol. 39, no. 4, pp. 367–380, 2021, doi: 10.1016/j.ijproman.2021.02.006.
M. Junaid, A. Khan, and S. Rehman, “Leadership communication and employee engagement in construction organizations,” Journal of Management in Engineering, vol. 39, no. 1, p. 04022075, 2023, doi: 10.1061/(ASCE)ME.1943-5479.0001075.
S. Azhar and M. Khalfan, “Integrated Project Delivery (IPD): Improving communication and collaboration in construction,” International Journal of Construction Project Management, vol. 12, no. 3, pp. 145–160, 2020.
R. Osei-Kyei, A. P. C. Chan, and E. E. Ameyaw, “The role of communication and collaboration in achieving project success,” Journal of Engineering, Design and Technology, vol. 20, no. 5, pp. 1203–1219, 2022.
E. Too and P. Weaver, “The management of project communication: A critical review,” International Journal of Project Management, vol. 39, no. 7, pp. 845–860, 2021.
A. B. Bakker and S. Albrecht, “Work engagement: Current trends and future directions,” Current Opinion in Psychology, vol. 43, pp. 265–269, 2022, doi: 10.1016/j.copsyc.2021.08.016.
A. M. Saks, “Employee engagement: A new theoretical approach and research agenda,” Human Resource Development Review, vol. 20, no. 1, pp. 9–28, 2021.
W. B. Schaufeli, “Engaging leadership and employee engagement: Theoretical foundations and practical implications,” European Journal of Work and Organizational Psychology, vol. 30, no. 4, pp. 465–478, 2021.
S. Durdyev, M. R. Hosseini, and R. Rameezdeen, “Digital quality management systems in construction: Integration with BIM for real-time monitoring,” Automation in Construction, vol. 134, p. 104064, 2022, doi: 10.1016/j.autcon.2022.104064.
Poliban, Sistem Manajemen Mutu pada Proyek Konstruksi di Indonesia. Banjarmasin, Indonesia: Politeknik Negeri Banjarmasin Press, 2020.
J. F. Hair, G. T. M. Hult, C. M. Ringle, and M. Sarstedt, A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM), 3rd ed. Thousand Oaks, CA, USA: SAGE Publications, 2021.
H. Serhan and I. Draganov, “Causes and effects of communication problems in construction projects,” Procedia Engineering, vol. 164, pp. 389–396, 2016, doi: 10.1016/j.proeng.2016.11.632.
G. Ofori, “Quality management in construction projects: Principles and practices,” International Journal of Construction Management, vol. 21, no. 3, pp. 225–238, 2021.
H. Aljassmi and S. Han, “Quality assurance and control integration in construction projects: A systematic approach,” Journal of Civil Engineering and Management, vol. 28, no. 3, pp. 241–255, 2022, doi: 10.3846/jcem.2022.16411.
X. Zhao, B. G. Hwang, and S. P. Low, “Critical success factors for quality performance in construction projects,” Total Quality Management & Business Excellence, vol. 32, no. 9–10, pp. 1087–1105, 2021.
International Organization for Standardization, ISO 9001:2015 Quality Management Systems — Requirements. Geneva, Switzerland: ISO, 2020.
Y. Ma, X. Li, and D. Chen, “Quality management practices and project performance in the global construction industry,” Engineering, Construction and Architectural Management, vol. 32, no. 1, pp. 45–62, 2025, doi: 10.1108/ECAM-09-2024-0921.
S. Wawak, “Enhancing project quality through effective team management and employee involvement,” International Journal of Information Systems and Project Management, vol. 12, no. 1, pp. 35–50, 2024.
A. H. Simukonda, “Employee engagement and quality performance in construction projects: A cross-sectional study in developing economies,” Journal of Construction Research, vol. 29, no. 3, pp. 212–227, 2024, doi: 10.1142/S1609945124500159.
Y. Shin, W. Hur, and H. Kim, “Training and development as drivers of employee engagement in project-based environments,” Journal of Organizational Effectiveness, vol. 7, no. 3, pp. 295–312, 2020.
Y. Zhang and S. Hao, “Construction project manager’s emotional intelligence and team effectiveness: The mediating role of team cohesion and moderating effect of time,” Frontiers in Psychology, vol. 13, p. 857042, 2022, doi: 10.3389/fpsyg.2022.857042.
M. Loosemore and B. T. H. Lim, “Cultural diversity and communication challenges in construction project management,” Engineering, Construction and Architectural Management, vol. 28, no. 9, pp. 2798–2812, 2021.
A. M. Alashwal, H. Rahman, and A. M. Beksin, “Building Information Modeling (BIM) and project communication effectiveness in construction projects,” Journal of Construction Engineering and Management, vol. 147, no. 5, p. 04021022, 2021, doi: 10.1061/(ASCE)CO.1943-7862.0002054.
A. Siddiqui and S. Qureshi, “The impact of project manager communication and interpersonal skills on project success: A study of construction sector,” International Journal of Construction Project Management, vol. 16, no. 2, pp. 101–118, 2024.
A. Rehan, M. Khan, and H. Li, “A framework for leadership practices and communication in project success,” Journal of Construction Project Management, vol. 18, no. 2, pp. 75–91, 2024.
Z. Ahmed, M. Khan, and J. Lee, “Integrating total quality management and employee engagement for sustainable project performance: Evidence from construction firms,” International Journal of Project Management, vol. 43, no. 2, pp. 182–195, 2025, doi: 10.1016/j.ijproman.2025.01.006.
N. Urbach and F. Ahlemann, “Structural equation modeling in information systems research using partial least squares,” Journal of Information Technology Theory and Application, vol. 11, no. 2, pp. 5–40, 2010.
S. Yamin and H. Kurniawan, Generasi Baru Mengolah Data Penelitian dengan Partial Least Square Path Modeling. Jakarta, Indonesia: Salemba Infotek, 2011.
J. F. Hair, G. T. M. Hult, C. M. Ringle, and M. Sarstedt, A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM), 2nd ed. Thousand Oaks, CA, USA: SAGE Publications, 2019.
DOI: https://doi.org/10.33373/sigmateknika.v9i1.8823
Refbacks
- There are currently no refbacks.

E-ISSN 2599-0616
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Sigma Teknika
Gedung Lt.1 Kampus Universitas Riau Kepulauan Batam
Jl. Batu Aji Baru No.99 Batu Aji
Email: sigmateknika@journal.unrika.ac.id


