ANALISA RUGI-RUGI DAYA (LOSSES POWER) PADA JARINGAN TEGANGAN RENDAH PT. MUSIMAS BATAM
Abstrak
PT. MUSIMMAS BATAM is one of the largest integrated palm oil companies in the world that requires a three-phase voltage supply of approximately 250 amperes for each phase. PT. Musimmas Batam is supplied from a 150,000 KVA transformer through the LVMDP Panel, with priority on supplying electricity needs. The 3-phase voltage values are obtained, namely: R-S = 404.4 V, R-T = 404.2 V, S-T = 404.1 V with a neutral voltage of R-N = 23.2 V, S-N = 23.1, T-N = 23.3. And the 3-phase current IR = 202.9 Amperes, IS = 213.7 Amperes, IT = 200.7 Amperes. Total Power Calculation at LVMDP based on the equation looking for Iaverage = 205.7 A, Based on the equation looking for Vaverage = 1212.7 V, Based on the equation looking for P = 241.9 Kw. Power losses for a 400 mm² wire (R = 0.047 Ω/km) is 46.6 watts/km = 0.046 kW/km, and the total length of the conductor cable from the LVMDP Panel to the Load 500 M with the calculation of power losses, namely : P = 4833 watts/km. While the total power supply is 8.0 Kw = 8000 watts, so it can be seen = 3167 watts/km (3.16 Kw). Where is the active power of the transformer (P) = 145.5 kW. Thus, the percentage of losses due to neutral currents in the neutral conductor of the transformer is 0.03%.
Key word : LVMDP Panels, Cables, Loads
Referensi
Pansini, A.J. 2007. Electrical Distribution Engineering, Third Edition, The Fairmont, Inc., Indian Trail.
Dwi Cahyanto, Restu. 2008. Studi Perbaikan Kualias Tegangan Dan Rugi-Rugi Daya Pada
Penyulang Pupur Dan Bedak Menggunakan Bank Kapasitor, Trafo Pengubah Tap Dan Penggantian Kabel Penyulang. Jakarta: Elektro UI.
Tjahjono, “Analisa Perbaikan Losses Dan Jatuh Tegangan Pada Jaringan Sambungan Rumah Tidak Standar Dengan,” J. Media Elektro, vol. 4, pp. 6–7, 2013.
Tjahjono, “Analisis tegangan dan losses pada jaringan distribusi terhadap pemasangan pembangkitan distribusi,” J. Media Elektro, vol. 7, no. 1, 2010.
Kurniawan, “Analisa jatuh tegangan dan penanganan pada jaringan distribusi 20 kv rayon palur pt. pln (persero) menggunakan etap 12.6,” J. Tek. elektro, vol. 2, p. 9, 2016.
Hari Putranto dan Ratih Novalina Putri, “Analisa Perhitungan losses Pada Jaringan Tegangan Menengah Dengan Perbaikan Pemasangan Kapasitor,”J. Intake, vol. 20, pp. 23–28, 2013.
S. Sampeallo, W. F. Galla, and R. A. Oematan, “Analisis Jatuh Tegangan Pada Penyulang 20 kV Berdasarkan pada Perubahan Beban (Studi Kasus Penyulang Penfui dan Penyulang Oebobo PT. PLN Persero Rayon Kupang),” J. Media Elektro, vol. 1, no. 3, pp. 111–118, 2013
SIGMA TEKNIKA menggunakan perjanjian lisensi eksklusif. Penulis akan mempertahankan hak cipta bersama hak penggunaan ilmiah dan Universitas Riau Kepulauan akan diberikan hak penerbitan dan distribusi.
Akses penulis terbuka mempertahankan hak cipta dari makalah mereka, dan semua artikel terbuka didistribusikan di bawah syarat-syarat Lisensi Pengaitan Creative Commons (CC-BY), yang memungkinkan orang lain mendistribusikan dan menyalin artikel asalkan karya asli dikutip dengan benar.
Pengguna tidak dapat mewakili penulis sebagai dukungan adaptasi artikel mereka, dan tidak mengubah artikel sedemikian rupa untuk merusak kehormatan atau reputasi penulis.
SIGMA TEKNIKA uses an exclusive license agreement. The author will defend the copyright along with the scientific use rights and Riau Kepulauan University will be given the rights to issue and distribute.
Open author access retains the copyright of their paper, and all open articles are distributed under the terms of the Creative Commons Attribution License (CC-BY), which allows others to distribute and copy articles provided the original work is properly quoted.
Users cannot represent authors as support for the adaptation of their articles and do not change articles in such a way as to damage the honor or reputation of the author.