| Issue | Title | |
| Vol 8, No 2 (2025): SIGMATEKNIKA, VOL. 8, N0. 2, NOVEMBER 2025 | ANALISIS KETERLAMBATAN PROYEK KONSTRUKSI JALAN YANG MENGAKIBATKAN PUTUS KONTRAK DI KEPULAUAN MENTAWAI | Abstract PDF |
| Asril Asril, Bahrul Anif, Wardi Wardi | ||
| Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023 | ANALISIS KETERSEDIAAN DAN KEBUTUHAN INFRASTRUKTUR SUMBER DAYA AIR DI BATAM | Abstract PDF |
| Alpano Priyandes | ||
| Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 | ANALISIS KINERJA SIMPANG TIDAK BERSINYAL BERDASARKAN MKJI 1997 (Studi Kasus Ruas Jalan Tengku Sulung dan Jalan Raja M. Saleh) | Abstract PDF |
| Meva Bangun, Dian Hastari Agustina, Edi Kusmawan | ||
| Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 | ANALISIS NERACA AIR DAERAH ALIRAN SUNGAI (DAS) TIBAN LAMA (STUDI KASUS: WADUK DURIANGKANG DI KOTA BATAM) | Abstract PDF |
| Harry Kurniawan, Nadia Khaira Ardi, Kuswanto Kuswanto | ||
| Vol 8, No 2 (2025): SIGMATEKNIKA, VOL. 8, N0. 2, NOVEMBER 2025 | ANALISIS PELUANG PENGHEMATAN KONSUMSI ENERGI LISTRIK DI GEDUNG FAKULTAS SAINS DAN TEKNOLOGI ULB | Abstract PDF |
| Doni Pinayungan, Suwarno Suwarno, M. Fitra Zambak | ||
| Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 | ANALISIS PENERAPAN BUDAYA 5S DI LABORATORIUM POLITEKNIK INDUSTRI LOGAM MOROWALI | Abstract PDF |
| Yudi Siswanto, Abduh Malik Alfafa, Amiruddin Amiruddin | ||
| Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 | ANALISIS PENGARUH FLOW RATE BACKING GAS TERHADAP KUALITAS PENGELASAN DUPLEX STAINLESS STEEL | Abstract PDF |
| Ayub Fitra Arianto, Agus Umar Ryadin, Arif Rahman Hakim | ||
| VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 | ANALISIS PENGARUH SUDUT KAMPUH DAN KUAT ARUS PENGELASAN TERHADAP KEKUATAN TARIK HASIL PENGELASAN SHIELDED ARC WELDING (SAW) | Abstract PDF |
| Arif Rahman Hakim, Fardin Hasibuan | ||
| Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 | ANALISIS PENGENDALIAN KUALITAS PRODUKSI BATU KUMBUNG MENGGUNAKAN METODE SEVEN TOOLS (Studi Kasus : CV. Salsabilah Group) | Abstract PDF |
| Muhammad Wahdan Syifa Aunillah, Mohammad Dian Kurniawan, Hidayat Hidayat | ||
| Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 | ANALISIS PERCEPATAN JADWAL PELAKSANAAN PROYEK DENGAN METODE PERT DAN CPM (STUDI KASUS PEMBANGUNAN VILLA PANBIL TYPE JIMBARAN BLOK R.12) | Abstract PDF |
| Harry Kurniawan | ||
| Vol 1, No 2 (2018): Sigma Teknika Vol 1 No 2 November 2018 | ANALISIS PERHITUNGAN KERJA RELAY GANGGUAN TANAH PADA FEEDER DI GARDU INDUK 150 KV SEI HARAPAN PT XYZ BATAM | Abstract PDF |
| Chandra Noviansyah, Muhammad Irsyam | ||
| Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 | ANALISIS POSTUR KERJA SECARA ERGONOMI PADA OPERATOR PENCETAKAN PILAR YANG MENIMBULKAN RISIKO MUSCULOSKELETAL | Abstract PDF |
| Annisa Purbasari, Maria Azizta, Bendika Anna H. Siboro | ||
| Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 | ANALISIS RESIKO KECELAKAAN KERJA DI BENGKEL PT. XYZ DENGAN METODE FAILURE MODE AND EFFECT ANALYSIS | Abstract PDF |
| Bagas Imawan, Efta Dhartikasari Priyana, Yanuar Pandu Nugroho | ||
| Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 | ANALISIS STABILITAS DAN KONSISTENSI CAMPURAN ASPAL SLURRY SEAL DENGAN PENAMBAHAN ABU AMPAS TEBU | Abstract PDF |
| Herlina Suciati, Akhmad Khildan Arba'in, Panusunan Panusunan, Akhbar Ilmiah Room | ||
| VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 | Analisis Stabilitas Lereng dan Alternatif Perkuatan Soil Nailing pada Ruas Jalan Lingkar Serasan Kabupaten Natuna | Abstract PDF |
| Robby Maulana, Dian Hastari Agustina | ||
| 31 - 45 of 309 Items | << < 1 2 3 4 5 6 7 8 9 10 11 12 > >> | |






.jpg)

