| Issue | Title | |
| Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023 | EVALUASI PEMBOROSAN MESIN JUMBO LOOM BERBASIS PENDEKATAN STATISTICAL PROCESS CONTROL | Abstract PDF |
| Taraz Atillah Nofanda, Nina Aini Mahbubah | ||
| Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 | EVALUASI PERAMALAN PERMINTAAN PRODUK KOPI BUBUK MENGGUNAKAN PENDEKATAN TIME SERIES DI UKM EYANG KAKUNG - GRESIK | Abstract PDF |
| Seftian Amiludin, Nina Aini Mahbubah | ||
| Vol 3, No 1 (2020): SIGMA TEKNIKA, VOL 3 NO.1, JUNI 2020 | EVALUASI POSTUR KERJA DI STASIUN KERJA CRIMPING SPLICE PT. XXX DENGAN METODE QUICK EXPOSURE CHECK | Abstract PDF |
| Annisa Purbasari, Mr. Alex, Benedikta Anna H. Siboro | ||
| Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 | EVALUASI POSTUR KERJA OPERATOR PACKING BERBASIS PENDEKATAN RAPID ENTIRE BODY ASSESMENT DI UD. XEVIPRODUCTION | Abstract PDF |
| Dimas Aditya Ferdiansyah, Nina Aini Mahbubah | ||
| Vol 8, No 2 (2025): SIGMATEKNIKA, VOL. 8, N0. 2, NOVEMBER 2025 | EVALUASI RISIKO CEDERA MUSCULOSCELETAL BERBASIS METODE RULA DAN REBA PADA OPERATOR BAGIAN PENGIRIMAN BARANG DI PT DCF | Abstract PDF |
| Mohammad Ahsantudh Dhonny, Nina Aini Mahbubah | ||
| VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 | EVALUASI RISIKO KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK INSTALASI PIPANISASI DI PT EFE BERBASIS METODE JSA DAN HIRARC | Abstract PDF |
| Muhammad Ricky Wiryawan, Nina Aini Mahbubah | ||
| Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 | EVALUATING REAL ESTATE MARKET IN JAKARTA | Abstract PDF |
| Kenly Muliana Pamadi | ||
| Vol 8, No 1 (2025): SIGMATEKNIKA, VOL. 8, N0. 1, JUNI 2025 | EVALUATION OF INDOOR ENVIRONMENTAL QUALITY IN HEALTH LABORATORY FACILITIES: COMPLIANCE WITH INDONESIAN HEALTH STANDARDS AT POLTEKKES RIAU | Abstract PDF |
| Nopriandi Nopriandi, Zulherman Zulherman, I Nengah Tela | ||
| Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 | EVALUSI SISTEM INFORMASI PELAYANAN PERIZINAN BERUSAHAAN SEKTOR INDUSTRI MELALUI ONLINE SINGLE SUBMISSION BERBASIS METODE TECHNOLOGY ACCEPTANCE MODEL DI DPM PTSP KABUPATEN GRESIK | Abstract PDF |
| Hendrik Ady Saputro, Nina Aini Mahbubah | ||
| Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 | FAKTOR KETERLAMBATAN PEKERJAAN PEMBANGUNAN GEDUNG PADA KABUPATEN SIJUNJUNG | Abstract PDF |
| Nurhayati Nurhayati, Bahrul Anif, Heldi Heldi | ||
| Vol 8, No 1 (2025): SIGMATEKNIKA, VOL. 8, N0. 1, JUNI 2025 | FAKTOR PENYEBAB RENDAHNYA KOMPETENSI KONSULTAN PENGAWAS PADA PROYEK GEDUNG PEMERINTAH JAMBI | Abstract PDF |
| Wibowo Atthaariq, Rini Mulyani, Khadavi Khadavi | ||
| Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 | FAKTOR PENYEBAB TANAH LONGSOR PADA WILAYAH KABUPATEN SIJUNJUNG | Abstract PDF |
| Wilda Ardes, Zuherna Mizwar, Rusnardi Rahmat Putra | ||
| Vol 8, No 1 (2025): SIGMATEKNIKA, VOL. 8, N0. 1, JUNI 2025 | FAKTOR-FAKTOR TATA KELOLA ARSIP PADA DINAS PUPR KOTA SUNGAI PENUH | Abstract PDF |
| YZ Oktovianus, Zulherman Zulherman, Dwifitra Y Jumas | ||
| Vol 1, No 1 (2018): Sigma Teknika Vol 1 No 1 Ferbuari 2018 | GALERI FOTOGRAFI DI KOTA BATAM DENGAN PENDEKATAN ARSITEKTUR METAFORA | Abstract PDF |
| Rino Purna Irawan, Supriyanto Supriyanto, Abraham Jarusalem Rahman | ||
| Vol 1, No 1 (2018): Sigma Teknika Vol 1 No 1 Ferbuari 2018 | GEDUNG OLAHRAGA DENGAN PENEKANAN ARSITEKTUR HIGH TECH | Abstract PDF |
| Muhammad Rizal, Y. Seno Prakoso, Whida Elastu Permana | ||
| 76 - 90 of 332 Items | << < 1 2 3 4 5 6 7 8 9 10 11 12 > >> | |



