Browse Title Index


 
Issue Title
 
Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 PERENCANAAN DRAINASE JALAN RAYA DI JALAN BRIGJEN KATAMSO KM 6 – KM 7 TANJUNG UNCANG, BATAM Abstract   PDF
Harry Kurniawan, Radinal Ramnuari
 
Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 PERENCANAAN GEDUNG OLAHRAGA INDOOR DILIHAT DARI ASPEK FUNGSIONAL, ASPEK KUALITATIF DAN ASPEK KUANTITATIF PADA PERENCANAAN GOR TANJUNGPINANG Abstract   PDF
Supriyanto Supriyanto
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 PERENCANAAN KAPASITAS PRODUKSI ATV 32C DENGAN MENGGUNAKAN METODE CAPACITY REQUIREMENT PLANNING (CRP) (Studi kasus di PT Schneider Electric Manufacturing Batam) Abstract   PDF
Vera Methalina Afma, Herry Irwan, Rolyex Togi
 
VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 PERENCANAAN KEBUTUHAN DISTRIBUSI MENGGUNAKAN PENDEKATAN DISTRIBUTION RESOURCES PLANNING PADA PERUSAHAAN BAJA COR Abstract   PDF
Dimas Akmarul Putera, Rosie Oktavia Puspita Rini, Ansarullah Lawi, Tirta Mulyadi, Wahyudi Ilham, Aulia Agung Dermawan
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 Perencanaan Perpipaan Air Bersih Gedung Hotel Baloi View Batam Abstract   PDF
Daniel Noviandy
 
Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 PERENCANAAN STRUKTUR GEDUNG DELAPAN LANTAI RUMAH SAKIT AWAL BROS, BATU AJI – KOTA BATAM Abstract   PDF
Yoga Ari Wardana, Harry Kurniawan, Edi Kusmawan
 
Vol 3, No 1 (2020): SIGMA TEKNIKA, VOL 3 NO.1, JUNI 2020 PERHITUNGAN DAN PENGUJIAN BEBAN PADA GENERATOR DI KAPAL TUGBOAT HANGTUAH V Abstract   PDF
Mr. Ricesno, Reza Nandika
 
Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022 Perhitungan Daya Dukung Tiang Pancang Tunggal Dan Kelompok (Studi Kasus Proyek Hangar Lion Air Batam) Abstract   PDF
Mulyono Mulyono, Dian Hastari Agustina
 
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 PERILAKU STRUKTURAL SAMBUNGAN SEKRUP SEARAH DAN BERLAWANAN ARAH PADA STRUKTUR BAJA RINGAN Abstract   PDF
Anita Dewi Masdar, Sabri Haris, Astuti Masdar
 
Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 PERMASALAHAN SUMBER DAYA AIR DALAM PENGELOLAAN DAERAH IRIGASI SANGKIR GARAGAHAN Abstract   PDF
Evince Oktarina
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 POKA YOKE TO PREVENT HUMAN ERROR AT MOULDING PROCESS OF INTEGRATED CIRCUIT ASSEMBLY Abstract   PDF
Arif Rahman Hakim, James Hellyward
 
Vol 8, No 1 (2025): SIGMATEKNIKA, VOL. 8, N0. 1, JUNI 2025 POTENSI RFID DALAM LOGISTIK: KAJIAN LITERATUR DENGAN FOKUS PADA PUSAT PERDAGANGAN BATAM Abstract   PDF
Dimas Akmarul Putera, Arief Andika Putra
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 PREDIKSI NILAI MODULUS RESILIEN LAPIS PONDASI ATAS BERDASARKAN NILAI DCP MENGGUNAKAN ALAT DYNAMIC CONE PENETROMETER PADA BEBERAPA TITIK JALAN KOTA BATAM Abstract   PDF
Mulyati Mulyati, Dian Hastari Agustina
 
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 PROBLEMS REGARDING THE OPERATION OF CONTROLLED LANDFILL IN TANJUNGPINANG Abstract   PDF
Zures Gustiabani, Seow Ta Wee
 
Vol 2, No 1 (2019): Sigma Teknika Vol.2 No.1 Juni 2019 PROGRAM TRAINING PENGEMBANGAN KEWIRAUSAHAAN UNTUK MENINGKATKAN KEMAMPUAN PENGELOLAAN BISNIS USAHA KECIL DAN MENENGAH (UKM) Abstract   PDF
Zaenal Arifin
 
241 - 255 of 284 Items << < 11 12 13 14 15 16 17 18 19 > >>