| Issue | Title | |
| Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 | PERANCANGAN SOLAR CELL SEBAGAI SUMBER ENERGI LISTRIK ALTERNATIF UNTUK PENERANGAN LOBBY FAKULTAS TEKNIK UNIVERSITAS RIAU KEPULAUAN | Abstract PDF |
| Roma Gustiawan, Endang Susanti, Pamor Gunoto | ||
| Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 | PERANCANGAN TRAINER KIT TRAFFIC LIGHT TYPE OMRON SYSMAC CPM1A DI LABORATORIUM TEKNIK ELEKTRO | Abstract PDF |
| Pamor Gunoto, Jagat Pribadi | ||
| Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 | PERANCANGAN TRAINER MOTOR INDUKSI AC 3PH BERBASIS PROGRAM LOGIC CONTROLLER | Abstract PDF |
| Komaruddin Komaruddin, Pamor Gunoto, Endang Susanti | ||
| Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022 | PERANCANGAN TUNGKU PELEBURAN ALUMUNIUM KAPASITAS 3 KG BAHAN BAKAR GAS LPG | Abstract PDF |
| Agus Umar Ryadin, Rusmanto Rusmanto, Andi Masakim | ||
| Vol 1, No 2 (2018): Sigma Teknika Vol 1 No 2 November 2018 | PERANCANGAN WIRLESS STARTER KENDARAAN BERMOTOR MEMANFAATKAN BLUETOOTH BERBASIS ARDUINO | Abstract PDF |
| Endang Susanti, Nelvan Candra | ||
| Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023 | PERBAIKAN KUALITAS PROSES INSPEKSI VISUAL SPARE PART DENGAN PENERAPAN TQM PADA PT.XYZ | Abstract PDF |
| Larisang Larisang, Dwi Nandar, sanusi sanusi, Moh. Hafidz Efendy, Pattasang Pattasang | ||
| Vol 8, No 2 (2025): SIGMATEKNIKA, VOL. 8, N0. 2, NOVEMBER 2025 | Perbaikan Tata Letak IKM Es Kristal Kurnia Kota Dumai Menggunakan Metode Systematic Layout Planning | Abstract PDF |
| Fitra Fitra, Vania Adrilla Putri, Jeverson Lumban Gaol, Zulfadhli Ahmad, Qomaratun Nurlaila | ||
| Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023 | PERBANDINGAN ELEVASI DASAR SUNGAI BERDASARKAN HASIL ANALISIS PADA DEM DRONE, DEMNAS dan DEM SRTM | Abstract PDF |
| Zufrimar Zufrimar, Edwina Zainal | ||
| Vol 9, No 1 (2026): SIGMATEKNIKA, VOL.9, N0. 1, JUNI 2026 | PERBANDINGAN KUAT TEKAN BETON NORMAL DAN BETON DENGAN SUBSTITUSI AGREGAT HALUS PASIR LAUT PADA MUTU BETON F’C 30 | Abstract PDF |
| Kamarul Syawal, Dian Hastari Agustina, Nadia Khaira Ardi | ||
| Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 | PERBANDINGAN PERHITUNGAN DESAIN BEJANA TEKAN SUCTION SCRUBBER VERTICAL DENGAN SOFTWARE COMPRESS CODEWARE 2010 VERSUS MANUAL | Abstract PDF |
| Riko Fajariadi, Qomaratun Nurlaila, Arif Rahman hakim | ||
| Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 | PERENCANAAN DRAINASE JALAN RAYA DI JALAN BRIGJEN KATAMSO KM 6 – KM 7 TANJUNG UNCANG, BATAM | Abstract PDF |
| Harry Kurniawan, Radinal Ramnuari | ||
| Vol 9, No 1 (2026): SIGMATEKNIKA, VOL.9, N0. 1, JUNI 2026 | PERENCANAAN GEDUNG MADRASAH TSANAWIYAH PLUS TIGA BATUR | Abstract PDF |
| Ronny Junnaidy, Astuti Masdar, Avip Frasikha, Zuly Nelriska Wati | ||
| Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 | PERENCANAAN GEDUNG OLAHRAGA INDOOR DILIHAT DARI ASPEK FUNGSIONAL, ASPEK KUALITATIF DAN ASPEK KUANTITATIF PADA PERENCANAAN GOR TANJUNGPINANG | Abstract PDF |
| Supriyanto Supriyanto | ||
| Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 | PERENCANAAN KAPASITAS PRODUKSI ATV 32C DENGAN MENGGUNAKAN METODE CAPACITY REQUIREMENT PLANNING (CRP) (Studi kasus di PT Schneider Electric Manufacturing Batam) | Abstract PDF |
| Vera Methalina Afma, Herry Irwan, Rolyex Togi | ||
| VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 | PERENCANAAN KEBUTUHAN DISTRIBUSI MENGGUNAKAN PENDEKATAN DISTRIBUTION RESOURCES PLANNING PADA PERUSAHAAN BAJA COR | Abstract PDF |
| Dimas Akmarul Putera, Rosie Oktavia Puspita Rini, Ansarullah Lawi, Tirta Mulyadi, Wahyudi Ilham, Aulia Agung Dermawan | ||
| 271 - 285 of 332 Items | << < 13 14 15 16 17 18 19 20 21 22 23 > >> | |



