Browse Title Index


 
Issue Title
 
Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 PERENCANAAN GEDUNG OLAHRAGA INDOOR DILIHAT DARI ASPEK FUNGSIONAL, ASPEK KUALITATIF DAN ASPEK KUANTITATIF PADA PERENCANAAN GOR TANJUNGPINANG Abstract   PDF
Supriyanto Supriyanto
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 PERENCANAAN KAPASITAS PRODUKSI ATV 32C DENGAN MENGGUNAKAN METODE CAPACITY REQUIREMENT PLANNING (CRP) (Studi kasus di PT Schneider Electric Manufacturing Batam) Abstract   PDF
Vera Methalina Afma, Herry Irwan, Rolyex Togi
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 Perencanaan Perpipaan Air Bersih Gedung Hotel Baloi View Batam Abstract   PDF
Daniel Noviandy
 
Vol 3, No 1 (2020): SIGMA TEKNIKA, VOL 3 NO.1, JUNI 2020 PERHITUNGAN DAN PENGUJIAN BEBAN PADA GENERATOR DI KAPAL TUGBOAT HANGTUAH V Abstract   PDF
Mr. Ricesno, Reza Nandika
 
Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022 Perhitungan Daya Dukung Tiang Pancang Tunggal Dan Kelompok (Studi Kasus Proyek Hangar Lion Air Batam) Abstract   PDF
Mulyono Mulyono, Dian Hastari Agustina
 
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 PERILAKU STRUKTURAL SAMBUNGAN SEKRUP SEARAH DAN BERLAWANAN ARAH PADA STRUKTUR BAJA RINGAN Abstract   PDF
Anita Dewi Masdar, Sabri Haris, Astuti Masdar
 
Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 PERMASALAHAN SUMBER DAYA AIR DALAM PENGELOLAAN DAERAH IRIGASI SANGKIR GARAGAHAN Abstract   PDF
Evince Oktarina
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 POKA YOKE TO PREVENT HUMAN ERROR AT MOULDING PROCESS OF INTEGRATED CIRCUIT ASSEMBLY Abstract   PDF
Arif Rahman Hakim, James Hellyward
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 PREDIKSI NILAI MODULUS RESILIEN LAPIS PONDASI ATAS BERDASARKAN NILAI DCP MENGGUNAKAN ALAT DYNAMIC CONE PENETROMETER PADA BEBERAPA TITIK JALAN KOTA BATAM Abstract   PDF
Mulyati Mulyati, Dian Hastari Agustina
 
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 PROBLEMS REGARDING THE OPERATION OF CONTROLLED LANDFILL IN TANJUNGPINANG Abstract   PDF
Zures Gustiabani, Seow Ta Wee
 
Vol 2, No 1 (2019): Sigma Teknika Vol.2 No.1 Juni 2019 PROGRAM TRAINING PENGEMBANGAN KEWIRAUSAHAAN UNTUK MENINGKATKAN KEMAMPUAN PENGELOLAAN BISNIS USAHA KECIL DAN MENENGAH (UKM) Abstract   PDF
Zaenal Arifin
 
Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 PROTOTIPE SISTEM MONITORING KETINGGIAN AIR PADA TANGKI BERBASIS INTERNET OF THINGS Abstract   PDF
Ade Arya Poetra, Reza Nandika, Toni Kusuma Wijaya
 
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 RANCANG BANGUN DASHBOARD E-VOTING PEMILU PRESIDEN BEM SEKOLAH TINGGI TEKNIK IBNU SINA BATAM Abstract   PDF
Abdul Rohmat Basar, Benny Dwika Leonanda
 
Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 RANCANG BANGUN TEXT DAN ANIMASI 3 DIMENSI PADA LED CUBE BERBASIS ARDUINO UNO ATMEGA 328 Abstract   PDF
Muhammad Iqbal, Reza Nandika, Endang Susanti
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 RANCANG BANGUN TRAINER SIMULATOR UNTUK PELATIHAN AIR CODITIONAL R22 Abstract   PDF
Yunesman yunesman
 
181 - 195 of 210 Items << < 7 8 9 10 11 12 13 14 > >>